

If you’re considering raising your home, chances are you have a few (or a lot of) questions. Whether it’s about cost, safety, or what to expect during the process, we’ve got you covered. At Raise My House®, we’ve raised over 150 homes a year across Brisbane and beyond, so we’ve heard just about every question there is.
Here are the 7 most common questions homeowners ask us—along with our expert answers.
There are several reasons to raise your home, including:
Creating extra living space underneath for bedrooms, storage, or a garage
Flood protection, especially in Brisbane’s low-lying suburbs
Increasing property value through additional usable floor area
Preserving the character of heritage or Queenslander homes while modernising
House raising gives you flexibility to transform your home without starting from scratch.
Yes—when it’s done by qualified professionals using the right methods.
At Raise My House®, we use engineered systems, including telescopic posts, and each job is backed by structural certification. All our projects comply with QBCC regulations and Australian safety standards.
Safety is not negotiable—and our track record proves it.
It depends on the size and complexity of your project, but the typical timeline looks like this:
Preparation, surveys & approvals: 2–4 weeks
Raising & securing: 1–2 weeks
Construction of suspended slab or lower level: 6–12 weeks
Lowering & finalisation: 1–2 weeks
We’ll provide you with a clear timeline before we begin, so you know exactly what to expect.
In most cases, no—you’ll need to move out temporarily while the house is lifted and the lower level is constructed. This is for your safety and to allow our crew to work efficiently.
We’ll always give you advance notice and work to minimise disruption.
We take every precaution to protect your home. Our lifting process is controlled and precise, and any necessary supports or bracing are installed before we begin.
Some minor cracking (especially in older plaster) can happen, but it’s rare and usually cosmetic. We’ll walk you through everything so there are no surprises.
Yes—raising a home requires approval from your local council, and in many cases, building approval and engineering documentation.
The good news? We can help guide you through the entire process, including working with your certifier or designer.
Costs vary depending on:
The size and structure of the house
Whether a suspended slab is needed
The amount of new build underneath
Site conditions and access
As a rough guide, house raising starts from $30,000–$80,000, with full build-under projects ranging higher. We’re happy to provide a custom quote after a site visit.
At Raise My House®, we’re here to make the process clear, safe, and stress-free—from the first consultation to the final inspection.
📞 Get in touch today to book a free site consult and get expert advice tailored to your home.